from Saraburi Power Plant. Therefore, clarified to disseminate to investors and interested people in general Page 3 of 3 Best Regards, --Angoon Phimphkorn-- (Mr. Angoon Phimphkorn) Managing Director
study and develop the power plant project using LNG as fuel, including the project of import and distribution of LNG to fuel the power plant in Vietnam. The remarkable performance with the highest NNP in
thousand tons (-77% YoY and QoQ). Production was adversely impacted due to the extended shutdown of the EO-EG plant; first for the planned maintenance of 38 days and thereafter due to unforeseen mechanical
. Production was 30 thousand tons (-77% YoY and QoQ). Production was adversely impacted due to the extended shutdown of the EO-EG plant; first for the planned maintenance of 38 days and thereafter due to
practices regularly monitored and reported. Projects under construction are on track Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 98.9% construction progress. The
additional investments in plant, machinery, and office renovations to improve production efficiency and reduce production cost, for the Company’s sustainable growth in the future. However, some investments
follow additional criteria outlined in Section 3.4.2 Retrofitting that improves either power density or decreases emission intensity of the existing hydropower plant by at least 15% is eligible • The
production was partly offset by lower volumes at PHP plant in Germany due to force majeure by raw material supplier. Quarterly Last Twelve Months 1Q18 4Q17 1Q17 1Q18 YoY LTM 1Q18 LTM 1Q17 LTM YoY Production
% from 31 December 2018. • Current assets increased by Baht 2,671 million mainly increased of cash and cash equivalents from cash received from sales of property, plant and equipment from the restructuring
346.73 2.32 360.42 2.23 354.07 2.04 Property, Plant and Equipment 6,753.57 45.09 7,430.75 45.98 8,012.60 46.14 Deferred Tax Assets 358.17 2.39 373.55 2.31 383.79 2.21 Other Non - Current Assets 96.69 0.65