Eksangkul acts as a director of company and APCON Type of business of APCON Engineering system design and supply, machine installation, manage and maintain engaging in power plant construction for both
supplies increased Baht 17.9 million. 6. Property, Plant and equipment increased Baht 281.1 million. -2- 7. Right-of-use assets increased Baht 464.8 million. 8. Intangible assets increased Baht 1.8 million
(ขาดทุน) ของบริษัทร่วมที่ใช้วธีิส่วนได้เสีย ส่วนแบ่งก าไร (ขาดทุน) ของบริษัทร่วมท่ีใช้วิธีส่วนได้เสีย จากโรงไฟฟ้าใช้พลังงานความร้อนร่วม (Co- Generation Combined Power Plant) ของบริษทัย่อย ส าหรับไตรมาส 1
Total 17,630,000 100.00 At present, The Megawatt Company Limited has a plan to invest in the solar power plant with the installed capacity of 360 MWp located in Mandalay, the Republic of the Union of
3,130,000 17.75 4. Mr. Thanarat Possawong 2,500,000 14.18 Total 17,630,000 100.00 At present, The Megawatt Company Limited has a plan to invest in the solar power plant with the installed capacity of 360 MWp
12.8 million. -2- 6. Property, Plant and equipment increased Baht 327.4 million. 7. Right-of-use assets increased Baht 465.6 million. 8. Intangible assets increased Baht 1.3 million. 9. Deferred tax
of APCON Engineering system design and supply, machine installation, manage and maintain engaging in power plant construction for both government and private organizations Registered capital 1,050
% 11.63 0.55% Non-Current Financial Assets (Long-term investment) 3.66 0.19% 3.46 0.16% Property, plant and equipment 565.85 28.84% 581.77 27.46% Intangible assets 3.48 0.18% 1.74 0.08% Deferred tax assets
assets and non-current assets amount of Baht 495 million or 42.2% of total assets. The main compositions of assets were property, plant and equipment amount of Baht 339 million or 28.9%, inventories amount