Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
million baht or 100 percent because of the third quarter of 2020 can recognize revenue from solar panel installation business in the signal tower which is a new business. 1.6 Other income amounted to 2.90
in average natural gas price. Moreover, the Group had revenue from solar energy system installation service in the third quarter of 2024 amounting to Baht 21.8 million from installation service of
Government Savings Bank, the Project of information and communication technology Installation of the New Parliament Phase 2, the Project of the cables underground to enhance the area for the Eastern Aviation
by holding percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan by holding 51% of total shares of the project and later this project was
planning for pipe installation system and providing High Density Polyethelene (HDPE) pipe installation service and water management. On 8 March 2017, increased the issued and paid-up shares from 50 million
Installation 3.49 7.92 (4.43) (55.93%) 3 - Construction 1,079.05 645.15 433.90 67.26% 4 - Testing and Inspection 57.22 61.43 (4.21) (6.85%) 5 Cost of sales and services (1,734.66) (1,473.90) 260.76 17.69% Gross