Remark Sales and Services Income 686.15 582.93 103.22 17.71% - LPG Trading 195.57 186.44 9.13 4.90% 1 - Transportation 4.18 4.00 0.18 4.50% - Conversion Kit Installation 0.37 0.68 (0.31) (45.59%) 2
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Remark Sales and Services Income 582.93 361.15 221.78 61.41% - LPG Trading 186.44 190.36 (3.92) (2.06%) 1 - Transportation 4.00 2.44 1.56 63.93% 2 - Conversion Kit Installation 0.68 1.56 (0.88) (56.41%) 3
(Decreased) Percentage Remark Sales and Services Income 563.95 485.78 78.17 16.09% - LPG Trading 189.70 178.97 10.73 6.00% 1 - Transportation 4.72 3.29 1.43 43.47% 2 - Conversion Kit Installation 1.34 1.74
share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total project value
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Causing entrepreneurs to postpone investment plans. For the year 2019, the company recognizes income from the production line installation project and the testing of the production line work in Phase IV and
Installation 2.06 4.62 (2.56) (55.41%) 2 - Construction 2,228.33 1,405.03 823.3 58.60% 3 - Testing and Inspection 88.53 78.24 10.29 13.15% Cost of sales and services (2,778.79) (2,029.13) 749.66 36.94% Gross