A derivatives broker shall not reduce its paid-up capital to the extent that its shareholders’ equity is decreased unless permission is granted by the SEC. Clause 4 This Notification shall come into
started their operations. (7) Financial cost The Company and its subsidiaries’ financial cost from loan and permission note were Baht 41.93 million or increased by Baht 25.59 million or 156.66% from the
and waiting for the permission to use the landfill. Secondly, a recycling plant in Lampoon is expected to be complete the construction in November 2018. Lastly, a waste water pre-treatment plant is now
were increased by Baht 24 million but in 2018 recorded in asset for construction. (9) Financial cost The Company and its subsidiaries’ financial cost from loan and permission note were Baht 69.47 million
loan and permission note were Baht 21.48 million or increased from the same period of previous year by Baht 8.52 million or 65.66% due to its subsidiaries financial cost recorded in asset for
previous year Baht 4.6 million. The main reason resulted from gains on exchange rate increased Baht 3.1 million against the previous year’s loss income was Baht 4.8 million which classified into
-SIBs) in September 2017. Bangkok Bank, which is classified as a D-SIB, is required by the BOT to hold additional capital for the Higher Loss Absorbency (HLA), which gradually increasing the required
gains on exchange rate increased Baht 3.1 million against the previous year’s loss income was Baht 4.8 million which classified into administrative expenses. Any other incomes increased Baht 1.5 million
gains on exchange rate increased Baht 3.1 million against the previous year’s loss income was Baht 4.8 million which classified into administrative expenses. Any other incomes increased Baht 1.5 million
year faced with loss on exchange rate Baht 1.1 million, which classified into administrative expenses. In addition, the subsidiary’s other income increased Baht 0.6 million. Expenses Selling and