Attachment: Information Memorandum 1 Eureka Design Public Company Limited ("the Company") would like to notify the resolutions of the Board of Directors' meeting, No. 8/2020, 25th June 2020, considered and
million from telecommunication business, which is increased by Baht 335 million or 69% compared to the revenue of Baht 483 million for 2017. It results from the increase in revenue from the design and
design, work suspension or delay due to change in construction design Many projects are gradually completed. Concurrently, many new projects that have been signed into contract or about to be signed which
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins
tower, design and distribute steel structure according to the drawing, power distribution and heat energy business, construction and tunneling contractor and distribution of industrial products. In the
and changes and adjustment of the construction design, work suspension or delay due to change in construction design. Many projects are gradually completed. Concurrently, many new projects have been
enterprises customers, for example: the project of train tracking system development and cargo management of the State Railway of Thailand, the Project of Geographic Information Acquisition and Development for
needs a replacement to reduce the breakdown issue. KYE hires MKY to design and install the new air conditioner(MITSUBISHI ELECTRIC) which using the technology that enhances the efficiency in the test room
revenue from commercial biomass fuel sales in Q2/2018. 1.3 The company’s income from design and distribution of boat and minibus made by aluminium for the year2019 in the amount of Baht 119.22 million
Estimated total improvement cost (until Q2 2017) Aggregate actual cost Ended at Jun 30, 2017 Estimated Improvement cost (For remaining works) At Jun 30, 2017 Improvement cost Re-design cost, advisor cost