) . Due to the Group started recognizing interest expenses on loans from the NFPT- Phase1, Bang Pa-in – Phichit and the interest expenses of debentures No.1/2020 of the company. While the interest arising
, revenues from branches in the ramp-up phase continue to increase, namely Rama 2 branch, Bang Bua Thong branch, Chiangmai branch and especially, Bangna branch which will completed its first full-year in
higher project value. The large projects delivered in the Q1–2024 such as the Construction project to renovate a deteriorated power station Bang Samak Power Station in Chachoengsao Province of the
the government is quite limited. The large projects delivered in the Q2–2024 such as the Construction project to renovate a deteriorated power station Bang Samak Power Station in Chachoengsao Province
, Bangna-Trad Road (km 14), Tambon Bang Chalong, Amphoe Bang Phli, Samut Prakan 10540 to consider the following agenda items: Agenda 1 Message from the Chairman to the meeting Agenda 2 To consider and adopt
FPT’s fuel pipeline at Phayathai train Station, both principal and interest of Bt38.6 million, and the reversal of the provision of Bt29.4 million was due to the relocation of its pipeline at Bang Sue
provision of Bt29.4 million was due to the relocation of FPT’s pipeline at Bang Sue train Station. The Net profit attributable to the Equity of the Company of Bt808.6 million, decreased by Bt70.5 million or
building with a total lease area of 15,961 square metres. Location Ladyao, Bang Khen, Bangkok Title document Title Deeds No. 35752 Book value The company was established on September 14, 2017, and does not
end of June 2019, the progress of the installation of the M&E Systems of the MRT Blue Line Extension Project (Hua Lamphong - Lak Song and Bang Sue -Tha Phra) was at 82 percent slightly earlier than the
3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 2 Machine and Printing Equipment 268.86 345.60 Total value 510.53 707.45 3.4 Sale of investments