Energy, Ministry of Energy, the Philippines. It is still in the process of reviewing additional documentation from the Ministry of Energy and we have not been able to conclude any progress. Posting to the
Energy, Ministry of Energy, the Philippines. It is still in the process of reviewing additional documentation from the Ministry of Energy and we have not been able to conclude any progress. Posting to the
to conclude any progress. Posting to the Company’s Board meeting which came to an agreement that NPSI is not able to complete the set criteria in the agreement, due to not being able to acquire the
the Department of Energy, Ministry of Energy, the Philippines. It is still in the process of reviewing additional documentation from the Ministry of Energy and we have not been able to conclude any
freight saving. This does not have any impact on regional or consolidated EBITDA. 4Core EBITDA is Reported EBITDA less inventory gains/(losses) 5Core EPS is Reported EPS less inventory gains/(losses) less
) transactions 2Total of each segment may not always tally with consolidated financials due to holding segment 3Excludes price adjustment for captive sales on freight saving. This does not have any impact on
increased overall average operating rate of 86%. Higher freight rates positively impacted sales price in our respective domestic markets. This translated into an overall Fibers Core EBITDA growth of 23% QoQ
; and to survey, study, research, analyze, and examine engineering materials and tools; and to design, evaluate, conclude, report, and control an operation in various development projects regarding
, conclude, report, and control an operation in various development projects regarding architecture, every branches of engineering which are civil engineering, structural engineering, transportation
tools; and to design, evaluate, conclude, report, and control an operation in various development projects regarding architecture, every branches of engineering which are civil engineering, structural