received more automated system work, thus unable to control the installation time as projected in some projects. - Other income decreased 88.05% from the same period of last year due to in 2017, the Company
to The company has an automated system that is never done before, so it is not possible to control the installation time as expected. - Other income decreased 88.46% from the same quarter of last year
network with total project value of Baht 125.00 million. Under the contract, the project was due to complete in February 2018. Nevertheless, during installation, the installation areas were continuously
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which Hemodialysis
2020 The Company recognizes revenue from the production line installation project and the production line test for the whole system installation, which is expected to be installed in May 2020, resulting
installation of the production line and the testing of the production line in respect of the installation of the entire production line, which was installed successfully. In July 2020, the results of the
distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis services for kidney patients
Freight Service Revenues from Sea Freight Services operated by the subsidiary (AIL), in 2018 and 2017 were 54.11 million Baht and 32.92 million Baht, respectively. This is due to continuously increasing in
Baht or 58.85%. The revenue in this segment was lower since the Company terminated contract with the both customers on May 2018, and September 2018 because they breached the agreements. 1.3 Sea Freight
project value of Baht 125.00 million. Under the contract, the project was due to complete in February 2018. Nevertheless, during installation, the installation areas were continuously affected by floods