monitoring and evaluation of the relevance of the risks and resilience measures and related adjustments to those measures will be taken. M2: No clearing of woody vegetation over 3 metres in height after 2020
management and drought warning • Planting / removing vegetation explicitly to modify water temperatures, evaporation rates, runoff patterns Water Infrastructure Criteria under the Climate Bonds Standard
sequestration. Techniques can include soil carbon management, restoration of native vegetation, and eliminating in-field burning practices. Indirect land use Possible unintended consequences of indirect land use
, sourcing, or financial investments that do not cause or contribute to deforestation (AFi, 2019). Peatland: An area with or without vegetation with a naturally accumulated peat layer at the surface, while
PROSPECTUS CHANEL CERES PLC (incorporated with limited liability in England and Wales) EUR300,000,000 Sustainability-Linked Guaranteed Notes due 2026 unconditionally and irrevocably guaranteed by Chanel Limited Issue price: 99.726 per cent. and EUR300,000,000 Sustainability-Linked Guaranteed Notes due 2031 unconditionally and irrevocably guaranteed by Chanel Limited Issue price: 99.400 per cent. The EUR300,000,000 Sustainability-Linked Guaranteed Notes due 2026 (the "2026 Notes") and the EUR300,...