are located on and/or fixed on the exterior or in the interior of the area of the buildings and structures of CentralFestival Pattaya Beach shopping mall or on the surface of the buildings and
of decorating or facilitating users of the building and structures on the parts of the project which will be invested in by CPNREIT, which are located on and/or fixed on the exterior or in the interior
System Works of the Si Rat Expressway, the Si Rat - Outer Ring Road Expressway and the Udon Ratthaya Expressway 16/12/2020 18:28 Execution of Connected Transaction on Maintenance and Improvement of
and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
Landscape Conservation/Restoration - Surface of protected, safeguarded and/or rehabilitated natural landscape areas (or protected areas) in km² or % - area under certified land management in km² or in
No. WHAUP-CS014-2562 1 8 August 2019 Re Share Acquisition in Duong River Surface Water Plant JSC in Vietnam Dear President The Stock Exchange of Thailand WHA Utilities and Power Public Company
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management