information to purchase Rayong Purifier Plc. (presently known as RPCG Plc.) (RPC) shares for their own benefits, as well as Piyanuch Janetumnugul as aider and abettor in the scheme. With the referral from the
Mr. Somchai Phothi was a director. The 15.09-million-baht contract was for the construction of a wastewater treatment system and a water purifier system of an IEC project in Rayong province. Mr
construction of a wastewater treatment system and a water purifier system of an IEC project in Rayong province. Mr. Bhusana and Mr. Maruphong had signed in acceptance of the complete construction and approved
of a wastewater treatment system and a water purifier system of an IEC project in Rayong province. Mr. Bhusana and Mr. Maruphong had signed in acceptance of the complete construction and approved the
of a wastewater treatment system and a water purifier system of an IEC project in Rayong province. Mr. Bhusana and Mr. Maruphong had signed in acceptance of the complete construction and approved the
10.05% from the previous year. The significant growth in same store sales growth during the first half of 2019 was accentuated by the hike in sales of ‘air purifier’ and cooling products, due to high
with Bann Tongkum where Somchai was a director. The 15.09-million-baht contract was for the construction of a wastewater treatment system and a water purifier system of an IEC project in Rayong province
combustion performance, and the S Super Purifier as a cleaning agent for fuel injectors; in order to yield highest quality B10 Diesel product. As well as contributing to the lowering of the PM 2.5 pollutant
products which has been constantly growing, and is expected to become the base fuel in Thailand. Bangchak’s Gasohol S EVO FAMILY has incorporated the S Dual Purifier and the S Turbo Modifier additives into
Tank 2. 4 units of NETZSCH Machineries 3. 1 unit of Vacuum Cleaner with Jet Pulse System 4. 1 unit of Air Pump with Suspension Tank and Air Drier Price as Agreement : Total 2,2000,000 Baht Payment : Paid