Public Company Limited To President The Stock Exchange of Thailand Reference GPSC’s letter No. 10040000/021/58 dated on August 26, 2015 regarding the project of Central Utility Plant 4 or Central Utility
past 2 years and after the opening of the new club house in February 2018, MK increased significantly its competitive advantage in services. Flora Ville Golf and Country Club generated the highest
monitoring and evaluation of the relevance of the risks and resilience measures and related adjustments to those measures will be taken. M2: No clearing of woody vegetation over 3 metres in height after 2020
protected and/or restored indigenous species, flora or fauna - Mean Species Abundance (% and change) - Maintenance of genetic diversity of species (seeds, plants, animals) on a given territory - Number of
ecosystems (natural features) versus engineered or “designed” components (nature-based features). They state: 1 Cohen-Shacham, E., Walters, G., Janzen, C. and Maginnis, S. (eds.) 2016. Nature-based Solutions
Discussion & Analysis (MD&A) 6 2. Operating results by plant 2.1 Sriracha Power Plant: IPP Unit: THB million In Q2/2017, Sriracha Power Plant’s gross profit increased by Baht 52 million or 36% resulting from
follow additional criteria outlined in Section 3.4.2 Retrofitting that improves either power density or decreases emission intensity of the existing hydropower plant by at least 15% is eligible • The
% ownership interest.), is a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of the Philippines. 455 MW of the plant’s capacity and energy are contracted to the Manila Electric Company
a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of the Philippines. 455 MW of the plant’s capacity and energy are contracted to the Manila Electric Company (MERALCO) pursuant
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and