Complex Type 1 Investment Consultant
Investment Planner
Investment Planner
Complex Type 1 Investment Consultant
Complex Type 1 Investment Consultant
Investment Planner
. WATER SITUATION (CONT.) 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs 4. Transfer water from Klong Wang Tanoad, Chanthaburi to Prasae Reservoirs to maintain the water level
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
above. 6) GS can distribute water supply to user and reservoir can maintain an average water for distribution not less than 24,000 cubic metre per day and expected to be operated within the end of second
the area from May to July 2017, and additional raw water pumped from Bangpakong River into Bangpra reservoir. For Prasae reservoir water reserve was relatively below average since the company has been