System Works of the Si Rat Expressway, the Si Rat - Outer Ring Road Expressway and the Udon Ratthaya Expressway 16/12/2020 18:28 Execution of Connected Transaction on Maintenance and Improvement of
and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management
Limited entered into an extension of the concession agreement with the Expressway Authority of Thailand ( EXAT) on July 19, 2017 for the construction of the Connection between the Si Rat-Outer Ring Road
Expressway and Metro Public Company Limited (“the Company”) was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) with total of Baht 10,000 Million with floating interest rate
subsidiary’s net assets for the amount of THB 343.72 million. This discrepancy was deducted in shareholders' equity as changes of the proportion of subsidiary. 31 Mar. 31 Mar. 31 Dec. Mar 19 - Mar 19 - Unit
discrepancy between the two Acts, which one auditor should adhere to? A: The requirement on information disclosure aims to protect auditor who has discovered suspicious circumstance acquired from normal