Utilities Plant increased after the main customers resumed normal operation from the scheduled maintenance in Q2/2017 even though Sriracha Power Plant had lower dispatch volume to Electricity Generating
profit of GHECO-One due to lower Availability Payment from 8.5-day maintenance and a drop in average coal price. • Lower gross profit of HHPC due to lower electricity dispatch. • Gross profit of Small
, increased by Baht 11 million or 3% compared to the first half of 2017 due to the decrease in hourly operating maintenance cost followed lower dispatch volume according to EGAT’s instruction. Sriracha Power
plant and higher weight factor. Besides, increased power dispatch of HHPC is another contribution of increased IPP gross profit. In spite of the above, Sriracha Power Plant's gross profit decreased by THB
addition, the dispatch volume from Houay-Ho as a result of the lower power generation. The company will also have to recognize the interest expense which increased by Baht 133 million from Q2/2019 as this
(EGAT) per EGAT’s dispatch instruction, the gross profit increased by Baht 52 million or 36% from Q1/2017 from the increase in the Availability Rate and the Weight factor. • Rayong Central Utilities Plant
management especially from the Cogeneration power plants. Although in 2017, the Sriracha Power Plant had lower dispatch volume to Electricity Generating Authority of Thailand (EGAT) compared to 2016 due to the
Power Producer (IPP) increased by Baht 2,389 million mainly from the increase in average price of natural gas together with EGAT’s dispatch instruction of Sriracha Power Plant. The increase in coal cost
, resulting in higher revenue recognition together with the increase electricity sales volume corresponding to EGAT’s dispatch instruction and the decrease in maintenance cost as a result of the expiration of
Q1/2018 and Q1/2017, the cost decreased by 158 million or 4% due to the lower usage of natural gas of Sriracha Power Plant which is in-line with the decrease in volume dispatch per EGAT’s instruction