Virtual Power Plant (VPP) IFRS Sustainability Standards Capacity Building 28 พฤศจกิายน 2567 | ท าความรูจ้กักบั มาตรฐานการเปิดเผยขอ้มลูดา้นความยัง่ยนื (IFRS Sustainability Disclosure Standards
BBL ASSET MANAGEMENT COMPANY LIMITED|Brown Field Infrastructure Fund | Offering Date : 22/07/2019 - 05/08/2019
BBL ASSET MANAGEMENT COMPANY LIMITED|Brown Field Infrastructure Fund | Offering Date : 06/07/2017 - 27/07/2017
KASIKORN ASSET MANAGEMENT COMPANY LIMITED|Brown Field Infrastructure Fund | Offering Date : 09/09/2013 - 13/09/2013
KRUNG THAI ASSET MANAGEMENT PUBLIC COMPANY LIMITED|Brown Field Infrastructure Fund | Offering Date : 22/06/2015 - 26/06/2015
and 50.6 percent in Asia Pacific. This leads to a decrease in passenger load factor (PLF) by 12.4 percent compared to the same period last year. Worldwide average passenger load factor (PLF) for the
as overall power plant performances 3. Digitalization – to predict the machine’s degradation more accurate. Consequently, each plant will have more capacity available for sales by minimized spinning
and target to commence COD and record revenue in December 2018. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW have 92.6% construction progress. The COD schedule has
power plant at Baht 142.91 million, or 41.66 %. The increase of revenue from power plant comes from the 5 MW Prachinburi Power Plant at Baht 38.12 million and the 9.99 MW Kyotamba power plant in Japan at
LNG as fuel, including import and distribution of LNG to fuel the power plants in Vietnam. EGAT’s floating solar power plant B.Grimm Power - Energy China Consortium was awarded as EPC contractor for