No. CC20170505ELE May 12, 2017 Subject Report of the Resolutions of Board of Directors’ Meeting No.2/2017, the scheduling of the Extraordinary General Meeting of Shareholders No. 1/2017 and the entering into the transaction of acquisition and disposal of assets and the connected transaction To President The Stock Exchange of Thailand Enclosure Information Memorandum on the Acquisition and Disposal of Assets and Connected Transaction The Board of Directors of Cal-Comp Electronics (Thailand) Publi...
Analysis For the 1st Quarter Ended 31 March, 2019 Page 2 1.4 Commercial Operation Commencement of Collinsville Solar PV Power Station in the Commonwealth of Australia On March 21, 2019, Collinsville Solar
Installation of 63.24-kWh solar PV rooftop at Cash Service Center Udon Thani Construction design and selection of environmentally friendly materials, based on the concept of Green Building Design, under the
109,111 75,908 Period Discounting 0.38 0.38 1.25 1.25 2.25 2.25 3.25 3.25 4.25 4.25 PV factor-high (13.0%) 0.95 0.95 0.86 0.86 0.76 0.76 0.67 0.67 0.59 0.59 PV of cash flow-high (115,644) (80,453) (146,473
CONSTRUCTION 11 Solar WVO-Cooperatives Projects Type of Fuel Solar PV Installed Capacity 31 MW (combined 7 plants) Economic Ownership 100.0% SCOD 30 Dec 2018 PEA / MEA PPA 31 MW / 25 years % Progress 82.8
of natural gas corresponding to the crude oil price in the world market, the new accounting standard (Thai Financial Reporting Standard) regarding the financial instruments (TFRS 9) and the lease
due to the increase of natural gas cost by Baht 544 million following the rise in average price of natural gas which in line with the upward trend of crude oil price, whereas there was no significant
detailed below. The phase 2 of solar PV program for government agencies and agricultural cooperatives with targeted capacity of 219 megawatts selected by drawing lots process. A number of applicants were
Collinsville Solar PV Power Station in the Commonwealth of Australia On March 21, 2019, Collinsville Solar Power Project, with capacity of 42.50 megawatts, which the Company is investing in through Collinsville
1H’2019 EDL PPA 15 MW / 25 years % Progress 97.3% Progress on track Progress on track Dau Tieng 1 and Dau Tieng 2 Solar Plant Project (Xuan Cau) Type of Fuel Solar PV Installed Capacity 420 MW dc