clarify and disclose information in the following matters: (1) the true existence and legal rights on the coal mines, and (2) the report on the re-assessment results of the fair values of the mining
The SEC is also working with the DSI in accordance with the bilateral Memorandum of Understanding for Cooperation to investigate EARTH’s suspicious acquisition of the legal rights over coal mines in
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
installed capacity of 24,000 megawatts, which are primarily from coal-fired power. Peak demand in the Philippines is expected to increase 5.4 percent annually. The Philippines plan to expand its capacity by
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
overview of electricity situations for each country is briefed below. - The Philippines The Philippines’s installed capacity is approximately 21,000 megawatts, which are mainly from coal-fired power plants