System Works of the Si Rat Expressway, the Si Rat - Outer Ring Road Expressway and the Udon Ratthaya Expressway 16/12/2020 18:28 Execution of Connected Transaction on Maintenance and Improvement of
hedging at Baht 1.8 million. Other income from mold supplier, sales of scraps and obsolete equipment reported at Baht 3.2 million. Gross profit margin was dropped from 33.4% to 32.2% due to long aged
foreign exchange hedging at Baht 3.3 million. Other income from sales of scraps, obsolete machine and equipment reported at Baht 1.8 million. Gross profit was down from 35.2% to 33.1% due to the increase in
) Notification of the connected transaction. The Board of Directors’ Meeting resolved to approve entering into a connected transaction to sell the obsolete assets related to zinc production that are free from any
ended up 21.5% and export sales 78.5%. The Company reported gain from foreign exchange hedging at Baht 8.3 million. Other income from sales of scraps, obsolete equipment reported at Baht 2.5 million
foreign exchange hedging at Baht 2.1 million. Other income reported at Baht 0.9 million from transportation, sales of scraps, and obsolete equipment. Gross profit margin slightly increased from 32.2% to
and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
involvement against the negatives - e.g., Long-term horizon with focus on creating value versus inward isolation of ‘keeping it within the family’. • Competitive advantages versus private benefits of control
26.80 million. OLD Policy on allowance for obsolete inventories Considering inventories that are 5 years or older and considering the inventories. The net realizable value is the amount for which an asset
were: Cost of goods sold was Baht 15.21 million, increasing of 130.8% due to lots of new book titles book published and increased in numbers of provision of obsolete stocks. Selling and