System Works of the Si Rat Expressway, the Si Rat - Outer Ring Road Expressway and the Udon Ratthaya Expressway 16/12/2020 18:28 Execution of Connected Transaction on Maintenance and Improvement of
and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
constant volatility and instability in various ways due in part to the global pandemic of COVID-19 and the fast-paced changes in technology. Thus, it is inevitable for auditors to adjust their methodology to
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
: Possibility of delisted and rehabilitation companies due to financial instability and going-concern issue. Horizontal Analysis 0 2 4 6 8 10 12 2012 2013 2014 2015 2016 BSIZE ACSIZE 0% 10% 20% 30% 40% 50% 2012
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management
Limited entered into an extension of the concession agreement with the Expressway Authority of Thailand ( EXAT) on July 19, 2017 for the construction of the Connection between the Si Rat-Outer Ring Road
Expressway and Metro Public Company Limited (“the Company”) was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) with total of Baht 10,000 Million with floating interest rate