recorded 418.0 Million Baht or 24.7% of revenue from property business which rose significantly than that of Q2 2016. This was mainly due to the 33 residences that were transferred and recognized income in
and Analysis EXECUTIVE SUMMARY SIGNIFICANT EVENTS Commercial operation of ABPR3 From a total of three SPP power plants in Amata City Industrial Estate that have scheduled COD in 2018, ABPR3 is the first
= Selling, general & administrative expense OUR PROJECTS ABPIF = Amata B.Grimm Power Plant Infrastructure Fund ABP1 = Amata B.Grimm Power 1 ABP2 = Amata B.Grimm Power 2 ABP3 = Amata B.Grimm Power 3 ABP4
continuously support and grow together with us. Commercial operation of ABPR4 From a total of 3 SPP power plants in Amata City Industrial Estate that have scheduled COD in 2018, ABPR4 is the second gas-fired
support and grow together with us. Commercial operation of ABPR5 From a total of 3 SPP power plants in Amata City Industrial Estate that have scheduled COD in 2018, ABPR5 is the third gas-fired combined
Q1’2018 (Baht 7,651 million in Q1’2017 and Baht 7,762 million in Q4’2017), primarily due to an increase in revenue from the power plants that started COD on February 1, 2018, namely ABPR3, located in Amata
located in Amata City Rayong Industrial Estate) on February 1, June 1 and October 1, 2018 respectively. EBITDA • EBITDA increased 5.4% y-on-y to Baht 9,199 million in 2018 due to the operation of new power
Drivers: Sales volume Q1’19 Q4’19 Q1’20 change change GWh GWh GWh y-on-y q-on-q Electricity sales to EGAT 2,127 2,355 2,265 6.5% (3.8%) Electricity sales to IU - Thailand Amata City Chonburi Industrial
and building previously used for such business. In this year, ABC sold the assets and transferred revaluation surplus to gain on sale of the assets presented in the income statement. The transfer was
by January 16, 2015.ABC ceased its garment business operation and did not utilize its land and building previously used for such business. In this year, ABC sold the assets and transferred revaluation