withdrawal slip, failed to make proper verification before she jointly co-signed company payment checks or withdrawal slips in advance with another authorized director, causing the company to suffer losses
Plc. (SECC) with the power to sign company check or withdrawal slip, failed to make proper verification before he jointly co-signed company payment checks or withdrawal slips in advance with another
International Engineering Public Company Limited (IEC), through a purchase transaction of 25% of SK1 shares at the amount of 100 million baht. The transaction was executed after SK1 had been placed in absolute
International Engineering Public Company Limited (IEC), through a purchase transaction of 25% of SK1 shares at the amount of 100 million baht. The transaction was executed after SK1 had been placed in absolute
dishonestly and seeking wrongful gains, which caused damage to IEC, through a purchase transaction of 25% of SK1 shares at the amount of 100 million baht. The transaction was executed after SK1 had been placed
Public Company Limited (IEC), through a purchase transaction of 25% of SK1 shares at the amount of 100 million baht. The transaction was executed after SK1 had been placed in absolute receivership by the
surveillance system that was not circumspect enough to warn Bitkub to immediately realize a transaction that might be a price manipulation. DAB Act S.30 Settlement Committee Meeting No. 7/2021 Settlement
with the rules, conditions and procedures as specified in the notification of the Capital Market Supervisory Board that is no system to control short position transaction underlying with SET50 index
allowing the trading account to be used for the YCI transaction in exchange for compensation. The public prosecutor issued a non-prosecution order. The case was final. SEC Act S.243(1) in conjunction
allowing the trading account to be used for the YCI transaction in exchange for compensation. The public prosecutor issued a non-prosecution order. The case was final. SEC Act S.243(1) in conjunction