- Product quality (properly sampled and analysed for parameters that would affect its use: for example, heavy metals and other biocidal substances, particle size, contamination, stability). • The resulting
as to support more efficient investment in 4G. Investment in the new 2600MHz is commencing this year to support both 4G and 5G with approx. budget of Bt35-40bn targeting dense areas where 4G demand is
as to support more efficient investment in 4G. Investment in the new 2600MHz is commencing this year to support both 4G and 5G with approx. budget of Bt35-40bn targeting dense areas where 4G demand is
oversupply situation of light sweet crude, whereas supplies were tight during the previous year. Average DTD/DB in Q1/2019 reduced 0.79 $/BBL in comparison to Q4/2018, caused by lower supply of heavy crude oil
million metric tons, increasing 11.52% consisting of Hot Roll Coil and Sheet (thin gauge) at 0.707 million metric tons, increasing 14.57% and Thick gauge (Plate) at 28.2 thousand metric tons, decreasing
Excavation 3 Soil and Coal Milling Project at Mae Moh Mine, Contract No.6 decreased. Due to heavy rain in the project area, the operation could not be done at full capacity resulting in the loss from regular
% consisting of thin gauge at 2.50 MT, decreasing 21.69% and Thick gauge at 0.127 MT, decreasing 29.59% compared to the same period of previous year. GJS บริษัท จ ีเจ สตีล จํากดั (มหาชน) G J Steel Public Company
Hot Rolled Steel production in Q2/2017 was at 0.621 million metric tons, increasing 1.31% consisting of thin gauge at 0.592 million metric tons, increasing 8.70% and Thick gauge at 29.8 thousand metric
The Hot Rolled Steel production in Q3/2017 was at 0.814 million metric tons, increasing 18.36% consisting of thin gauge at 0.786 million metric tons, increasing 21.94% and Thick gauge at 28.2 thousand
at 2.92 million metric tons, increasing 9.28% consisting of thin gauge at 2.72 million metric tons, increasing 8.68% and Thick gauge at 0.206 million metric tons, increasing 17.82% compared to the