and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management
Limited entered into an extension of the concession agreement with the Expressway Authority of Thailand ( EXAT) on July 19, 2017 for the construction of the Connection between the Si Rat-Outer Ring Road
Expressway and Metro Public Company Limited (“the Company”) was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) with total of Baht 10,000 Million with floating interest rate
public enforcement in Asia, the first of its kind elaborated at a regional level. The Guide is the result of two years' work by a Task Force chaired by Ms. Selvarany Rasiah, Chief Regulatory Officer, Bursa
regulators from ASEAN countries whose primary task is to promote greater integration and connectivity of regional capital markets. One of the key initiatives by the ACMF is the development of sustainable asset
PowerPoint Presentation The Task Force on Climate-related Financial Disclosures (TCFD) Checklist The Securities and Exchange Commission Capacity Building Workshop 9 March 2022 Page 2 9 March 2022