Installation of Foam system for Remote Impoundment, and new project such as Heating, Ventilation and Air Conditioning of In-Plant Power Generation. 5. Testing and Inspection service slightly decreased from the
landlord-owned plant and equipment that are required to service the building and are not controlled by the building’s tenants. Such energy end uses include: • Heating, ventilation and air conditioning
resources are required for heating and air-conditioning, ventilation and the functioning of equipment in both offices and production plants. For the cosmetic sub-sector, the manufacture of many chemical
from disruptions caused by failures in supporting utilities (e.g., electricity, telecommunications, ventilation and air conditioning); 2. The intermediary should have measures relating to cabling