4 sets at stator assembly room G.16AB. Air conditioners system at stator assembly room G.16AB has deteriorated from use along for a long time over 20 years (Year 2001) and frequent breakdown problems
4 sets at stator assembly room G.16AB. Air conditioners system at stator assembly room G.16AB has deteriorated from use along for a long time over 20 years (Year 2001) and frequent breakdown problems
needs a replacement to reduce the breakdown issue. KYE hires MKY to design and install the new air conditioner(MITSUBISHI ELECTRIC) which using the technology that enhances the efficiency in the test room
Scoring Standardized, comparable, decision-ready data What investors and companies should be evaluating Breakdown of recommendations into accessible, actionable metrics Resources for providing complete and
driving the public towards a cashless society, creating a queue-free and self-serve experience for BTS users. LINE Corp (“LINE”), as a shareholder of RLP, has taken a notable step with the aim of
and Construction Public Company Limited (“Unique”) would like to inform regarding to a Connected Transaction since the major shareholder of Suphankeeree Company Limited (“Suphankeeree”) is the same
return to shareholder, the management has formulated business strategy and implemented group restructuring to streamline the business and enhance flexibility, which attributable to well-achieved
& ANALYSIS CONSOLIDATED P&L SNAPSHOT THB (mn) 2017/18 2018/19 YoY (%) PERFORMANCE ANALYSIS (2018/19 vs 2017/18) REVENUE BREAKDOWN (THB mn) % Contribution to total revenue THB (mn) 2017/18 2018/19 YoY (%) 2017
SNAPSHOT THB (mn) 1Q 2018/19 (Restated) 4Q 2018/19 (Restated) 1Q 2019/20 QoQ (%) YoY (%) REVENUE BREAKDOWN (THB mn) % Contribution to total revenue THB (mn) 1Q 2018/19 (Restated) 1Q 2019/20 YoY (%) 1Q 2018
PUBLIC COMPANY LIMITED 3Q 2019/20 SNAPSHOT & ANALYSIS CONSOLIDATED P&L SNAPSHOT THB (mn) 3Q 2018/19 (Restated) 2Q 2019/20 3Q 2019/20 QoQ (%) YoY (%) REVENUE BREAKDOWN (THB mn) % Contribution to total