Asymmetry (con’t) • Theoretical prediction about the role of individual stocks’ return history – Saar (2001) argues that the longer the run of price appreciation a stock experiences, the lower the buy-sell
year. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 87.6% construction progress targeted to commence COD on December 1, 2018. ABBREVIATION & OUR PROJECTSFINANCIAL
and target to commence COD and record revenue in December 2018. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW have 92.6% construction progress. The COD schedule has
increase of service fee by 10% is also reasonable to the space and conditions of services and the fees remain unchanged for 6 years. 5 From the aforementioned, the renewal of the Service Agreement is thus
(Run of the river) with an installed capacity of 15 MW have 97.3% construction progress. The COD schedule has been shifted slightly from December 1, 2018 to 1H’2019 due to longer time for Lao PDR’s
Sales to Industrial Users (IUs) – Vietnam Electricity sales to industrial users in Vietnam remained unchanged year-on-year at Baht 889 million for 9M’2017. ► The volume of electricity sold to industrial
and targeted to lead to $350 million in run-rate cost savings by 2023. These initiatives and the strategic acquisition of the Huntsman Integrated Ethylene and Propylene Oxide (EO & PO) assets (code
60.00 80.00 100.00 120.00 (2.00) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 Q1/2017 Q4/2017 Q1/2018 Market GRM GRM Hedging Inventory Gain(Loss) Crude run (KBD) 7.96 FO/DB crack spread dipped by 1.93 $/BBL
result of the rise in natural gas prices while the Ft rate remained unchanged. Also, Sriracha Power Plant and IRPC-CP had maintenance shutdown in Q4/2018. The operating revenue in Q4/2018 was at Baht 5,837
result of the rise in natural gas prices while the Ft rate remained unchanged. Also, Sriracha Power Plant and IRPC-CP had maintenance shutdown in Q4/2018. The operating revenue in Q4/2018 was at Baht 5,837