- No. 033/2017 dated June 15, 2017 issued by Mai Khao District Administrative Organization which is a steel tank and base area 916.63 square meters for water storage located Moo.5 Mai Khao District
period of 30 years. The Project, production and distribution of water supply, has water sources from old mine area about 340 Rai lacated on Amphoe Tai Meang, Phang-Nga to use as reservoir for pruduce and
/2017 dated June 15, 2017 issued by Mai Khao District Administrative Organization which is a steel tank and base area 916.63 square meters for water storage located Moo.5 Mai Khao District, ampher Talang
period of 30 years. The Project, production and distribution of water supply, has water sources from old mine area about 340 Rai lacated on Amphoe Tai Meang, Phang-Nga to use as reservoir for pruduce and
) to maintain the water level in the reservoirs above the dead storage level EASTERN WATER RESOURCES DEVELOPMENT AND MANAGEMENT PUBLIC COMPANY LIMITED MANAGEMENT DISCUSSION AND ANALYSIS FOR Q2/2020 3 3
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
power density greater than 5W/m2. For facilities becoming operational during 2020 or after, these thresholds are 50g CO2e/ kWh and 10W/m2. Additional criteria apply if it is a pumped storage facility. 3
A dynamic approach to criteria development This is the first version of the Grids and Storage Criteria. However, all Climate Bonds criteria aim to improve in line with industry best practice and
remaining of ongoing projects from backlog of 2017 which main income such as PTT TANK project, PTT LNG Cold Water project, and PTT Wangnoi Compressor Station project (PTT WCS). The proportion of revenue
operations within the business group. 2. Other Income Other Income which consist of storage tank fees, sales of scrap materials, interest income, gain on changes in fair value of short-term investment, and