matters: · ensure firm’s commercial considerations do not override the quality of work performed; · The firm’s performance evaluations, compensation, and promotion (including incentive systems) with
• Transmission and distribution infrastructure dedicated to a direct connection or an expansion of connection between power plants with energy intensities less than 100 g CO2e/kWh (life cycle emissions) is