long-term returns. In 2019, CPN progressed with the following asset enhancement initiatives. Renovation programs of existing malls are under way and expects to be completed in 2019 comprising a
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
-year feed-in tariff PPA, for the sale of electricity by the project with the contracted capacity of 640 MW. The construction of the project has progressed 60.67% (The construction plan was 62.95%). The
Directors’ Meeting No. 5/2018 and PF Board of Directors’ Meeting No. 9/2018. The construction of Carnival Magic Project has progressed by about 98.56% of the total construction, or 84.63% of the total
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
of the B20 and B10 diesel with special grade within Bangchak service stations to increase availability coverage. The company developed the “Bangchak Hi-Diesel B20 S” and “Bangchak Hi-Diesel S B10
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
revenue and generate a sustain long-term returns. In 2019, CPN progressed with the following asset enhancement initiatives. • The major renovation at CentralWorld, has been started phase by phase since 4Q16
estate development in Malaysia, have jointly developed Central i-City, through 60% and 40% investment proportions respectively. Located in a high potential area, Central i-City is part of the i-City