million due to corresponding to EGAT’s dispatched instruction resulting in higher fuel consumption. • Small Power Producer (SPP): The gross profit increased by Baht 2,115 million as a result of the first
gas decreased by Baht 343 million corresponding to EGAT’s lower dispatch instruction from Sriracha Power Plant. • The total cost of sales of goods and rendering services of Small Power Producer (SPP) in
shutdown approximately 10 days. There was a fell in Energy Payment (EP) following the lower dispatch volume as EGAT instruction. • Revenue of the company’s Small Power Producers (SPP) decreased by Baht 251
, increased by Baht 11 million or 3% compared to the first half of 2017 due to the decrease in hourly operating maintenance cost followed lower dispatch volume according to EGAT’s instruction. Sriracha Power
million or 57% from Q3/2017. The electricity dispatched volume in Q3/2018 was higher because of the reserved shutdown according to EGAT’s instruction of Sriracha Power Plant in Q3/2017. Also, the increase
Authority of Thailand (EGAT) because of the reserved shutdown following EGAT dispatch instruction; IRPC Clean Power Phase 1 (IRPC-CP Phase 1) ceased the gas turbine generator to commissioning with Phase 2 in
Power Producer (IPP) increased by Baht 790 million as a result of no maintenance shutdown in Q1/2020 for Sriracha Power Plant and higher dispatch volume according to EGAT instruction resulting in higher
For Q2/2017, Global Power Synergy Public Company Limited (GPSC) (“the company”) had a net profit of Baht 815 million, increased by Baht 65 million or 9% from Q1/2017. The increase is due to not only
Q1/2018 and Q1/2017, the cost decreased by 158 million or 4% due to the lower usage of natural gas of Sriracha Power Plant which is in-line with the decrease in volume dispatch per EGAT’s instruction
follows: • Cost of sales of goods and rendering services of IPP (Sriracha Power Plant) rose from the higher natural gas consumption corresponding to EGAT’s dispatched instruction. • Cost of sales of goods