in line with the current average period wherein an auditor is entrusted to be the engagement partner or the auditor affixing signature to express an opinion to financial statements on behalf of the
financial statements via the Electronic Information Transmission System of the Stock Exchange of Thailand (SET) in August 2018. The misconduct of the four current and former executives and directors* is
Pursuant to the existing regulations that have been effective since 2004, listed companies are required to pay an annual fee for submission of the annual registration statement to the SEC. In this regard, the annual fee is calculated based on the shareholders’ equity presented in the financial statements for the latest accounting year that have been submitted to the SEC. In case of a listed company not submitting the latest annual financial statements within the specified period, the SEC will ca...
period last year but slightly dropped 5.2% from last quarter due to electric vehicle business slowdown and telecommunication technology life cycle impact . Gross profit of this quarter amounted to Baht
Shotr-term loan to related - 13.04 Total current assets 46.67 246.57 Property, plant and equipment 819.25 2,699.39 - 12 - Intangible assets 3,580.97 3,580.97 Other non-current assets - 2.08 Total non
expected useful life of Buildings, Plant Machinery and equipment is according to the Company’s consideration and review of depreciation in the past by collecting and analyzing information related to the
estimated depreciation life of SAAM-SP1 power plant from 20 years to 25 year since 2017 onward, to be in line with the useful life of assets. For the year 2016 and 2017, the Group Company presented gross
revised expected useful life of Buildings, Plant Machinery and equipment is according to the Company’s consideration and review of depreciation in the past by collecting and analyzing information related to
Concession life : 20 years 3) Hikeme Solar Power Plant Location : Fukui City, Fukui Prefecture, Japan Contracted capacity : 1.50 MW Installed capacity : 1.86 MW Feed-in Tariff (FiT) : 32 JPY / kWh Commercial
Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe