Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant
operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe City, Toyama Prefecture, Japan Contracted capacity : 1.25 MW Installed capacity : 1.43 MW Feed-in Tariff
Concession life : 20 years 3) Hikeme Solar Power Plant Location : Fukui City, Fukui Prefecture, Japan Contracted capacity : 1.50 MW Installed capacity : 1.86 MW Feed-in Tariff (FiT) : 32 JPY / kWh Commercial
Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe
-9320 1 Ref: PLC 2017/017 November 16, 2017 Subject: Management Discussion and Analysis Quarter 3 Ended 30-September-2017 (Additional) To: The President of the Stock Exchange of Thailand Panjawattana
-9320 1 Ref: PLC 2017/012 August 14, 2017 Subject: Management Discussion and Analysis Quarter 2 Ended 30-June-2017 To: The President of the Stock Exchange of Thailand Panjawattana Plastic Public Company
-9320 1 Ref: PLC 2017/016 November 9, 2017 Subject: Management Discussion and Analysis Quarter 3 Ended 30-September-2017 To: The President of the Stock Exchange of Thailand Panjawattana Plastic Public
estimated depreciation life of SAAM-SP1 power plant from 20 years to 25 year since 2017 onward, to be in line with the useful life of assets. For the year 2016 and 2017, the Group Company presented gross
25 April 2019 To: The President The Stock Exchange of Thailand Re: Q1-2019 operating results We, Delta Electronics (Thailand) Public Company Ltd, would like to notify the Company’s Q1-2019 (Jan-Mar
future projects. In terms of the progress on Delisting Tender Offer of GLOW, the process was completed on 2 December 2019 and GLOW has been delisted from being listed on the Stock Exchange of Thailand on