operations of projects in 2019 which are Rayong Central Utility Plant 4 (CUP-4), Namlik 1 Power Company Limited (NL1PC) and Xayaburi Power Company Limited (XPCL), notwithstanding the recognition of expenses
, increased by Baht 130 million or 14% from Q1/18. The increase is mainly due to the rise in Availability Payment (AP) of Sriracha Power Plant and the increase in electricity sales of Rayong Central Utility
Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
located in the industrial eastern seaboard of Thailand in Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31
%) Executive Summary PAGE 2 MANAGEMENT DISCUSSION & ANALYSIS (MD&A) Q3 2019 Operating performance by plant in Q3/2019 The company’s gross profit was at Baht 5,467 million in Q3/2019 which decreased by 535
letter no. TG018/2561 on 19 January 2018) 5. Testing and Inspection service decreased from the previous year of 4.21 Million Baht, accounting for 6.85% as the decreased in service around metropolitan area
Q4/2019 or 38%. This increase contributed mainly from the increase in Availability Payment (AP) from Sriracha Power Plant corresponding to the depreciation of Thai Baht against US Dollar, while the
value measured from net assets acquired in proportionate holding on GLOW’s shares PAGE 3 MANAGEMENT DISCUSSION & ANALYSIS (MD&A) Q2 2019 Operating performance by plant in Q2/2019 The company’s gross
power plant at Baht 142.91 million, or 41.66 %. The increase of revenue from power plant comes from the 5 MW Prachinburi Power Plant at Baht 38.12 million and the 9.99 MW Kyotamba power plant in Japan at