Public Company Limited To President The Stock Exchange of Thailand Reference GPSC’s letter No. 10040000/021/58 dated on August 26, 2015 regarding the project of Central Utility Plant 4 or Central Utility
Discussion & Analysis (MD&A) 6 2. Operating results by plant 2.1 Sriracha Power Plant: IPP Unit: THB million In Q2/2017, Sriracha Power Plant’s gross profit increased by Baht 52 million or 36% resulting from
FY2019 Bangchak Corporation Plc. | 03 Table of Contents 06 09 29 25 27 31 Executive Important Events Summary Business Performance 11 - Refinery & Trading 16 - Marketing 19 - Power Plant 21 - Bio-based
% ownership interest.), is a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of the Philippines. 455 MW of the plant’s capacity and energy are contracted to the Manila Electric Company
a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of the Philippines. 455 MW of the plant’s capacity and energy are contracted to the Manila Electric Company (MERALCO) pursuant
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of the Philippines. 455 MW of the plant’s capacity and energy are contracted to the Manila Electric Company (MERALCO) pursuant
a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of the Philippines. 455 MW of the plant’s capacity and energy are contracted to the Manila Electric Company (MERALCO) pursuant
., Co., (EGCO holds a 49% ownership interest.), is a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of Republic of the Philippines. 455 MW of the plant’s capacity and energy are
Utilities Plant increased after the main customers resumed normal operation from the scheduled maintenance in Q2/2017 even though Sriracha Power Plant had lower dispatch volume to Electricity Generating