involved in the engagements? How does the firm oversee the work that is assigned? And how does the firm address the review of their work? 4 How does the firm document the performance of these
• Transmission and distribution infrastructure dedicated to a direct connection or an expansion of connection between power plants with energy intensities less than 100 g CO2e/kWh (life cycle emissions) is