Wind Criteria of the Climate Bonds Standard Wind Sector Eligibility Criteria of the Climate Bonds Standard Version 1.1 Date: October 2017 2 WIND CRITERIA OF THE CLIMATE BONDS STANDARD Table of
Wind Criteria of the Climate Bonds Standard เกณฑ์คุณสมบัติภาคพลังงานลมตามมาตรฐานตราสารหนี้ ว่าด้วยการเปลี่ยนแปลงสภาพภูมิอากาศ (Climate Bonds Standard หรือ CBS) ฉบับที่ 1.1 วันที่: ตุลาคม 2560 เกณฑ์
Corporation Pty Limited, a subsidiary, held by Broadspectrum Pty Limited and as part of the repayment of the outstanding long-term loans from Broadspectrum Pty Limited., including related rights under the terms
Utilities Co., Ltd. (Banpong) Klongluang Utilities Co., Ltd. (Klongluang) Chaiyaphum Wind Farm Co., Ltd. (Chaiyaphum) SPP Two Co., Ltd. (SPP 2) SPP SPP SPP SPP VSPP Page 4 SPP Three Co., Ltd. (SPP 3) SPP Four
, held by Broadspectrum Pty Limited and as part of the repayment of the outstanding long-term loans from Broadspectrum Pty Limited. including related rights under the terms of the agreement for an amount
power generation from solar and wind power. - Lao People’s Democratic Republic (Lao PDR) Lao PDR had a GDP growth of 6.5 percent from prior year, supported by investments in large infrastructure projects
operation (SCOD) for 16 MW wind farm projects, 13 MW LK Solar Floating and 45 MW EGAT solar floating (EPC service) are extended by 3-6 months to Q1’2021. For communities, under the “B.Grimm Fights COVID-19
, geothermal energy and wind power. - Lao People’s Democratic Republic (Lao PDR) Lao PDR’s installed capacity is approximately 6,300 megawatts, which are domestic consumption of 2,100 megawatts, export to
Green Co., Ltd. (RG) Banpong Utilities Co., Ltd. (BPU) Klongluang Utilities Co., Ltd. (KLU) Chaiyaphum Wind Farm Co., Ltd. (CWF) SPP Two Co., Ltd. (SPP 2) SPP Three Co., Ltd. (SPP 3) SPP Four Co., Ltd
with the SCOD in October 2020. Bo Thong 1&2 wind projects with 16 MW capacity had construction progresses of 29.2% with the SCOD in Q1’2021. Awards and Recognitions In June 2020, BGRIM was included in