-hazardous waste) is being built in Lumpoon and it is expected to finish within Q4/2018. The progress of JV company (Genco-Otani) is up to the plant construction state. The Genco Otani company has signed an
ACC6207/003 25 July 2019 Subject Inform the progress of the sale stock in the subsidiary company To Director/ Managing Director The Stock Exchange of Thailand Refer to the company's letter No
Operating Company Hydrotek Plc. Project Type Waste Water Treatment Plant and Collection System Project Value THB 239 mn Progress (% of Completion) 28.26 % Commissioning Date October 2016 Construction Period 1
, Nakorn Ratchasima. 30380 Tel: (66) 4429 1333, Fax: (66) 4429 1723 Website: www.navanakorn.co.th IR 008/100/2019 October 31,2019 Subject : Progress of the share acquisition of Thai Thanan Company Limited
has a positive progress as the firm continued to received extension in listing its products from large grocery chain store in the UK, including ASDA which agreed to list the Group’s products in 300
ACC6206/004 28 June 2019 Subject Inform the progress of the sale stock in the subsidiary company To Director/ Managing Director The Stock Exchange of Thailand According to the meeting of the Board of
previous year; B100 product sales volume rose, as the mandated mixture of B100 product in Diesel fuel was at 7% throughout the quarter, as well as gross profit was better as the crude palm oil cost used in
slightly, its mixture in Diesel fuel remains at 7% the entire quarter, Gross profit improved from the cost of crude palm oil that was used in manufacturing lowered at a faster pace than the price of B100
industrial waste to energy power plant project located at Ratchaburi Industrial Estate and operated by Progress Interchem (Thailand) Co., Ltd. (“Interchem”) with a contracted capacity of 4.0 MW (an installed
final blueprint Example Project A progress % billing % Q3’20 10 - Q3’20 20 - Q4’20 15 10 Q4’20 35 20 Q1’21 20 50 Q2’21 - 20 100 100The entity measures progress according to % billing recognise revenue 99