respectively, equivalent to 4.7% and 3.1% respective of the total liabilities. The main non-current liabilities in long-term debt. The long-term debt due date within one year is THB 10.5 MB and THB 5.3 MB
of the total liabilities. The main non-current liabilities in long-term debt. The long-term debt due date within one year is THB 10.5 MB and THB 8.1 MB respectively, equivalent to 2.4% and 2.2
and Q2/2019, the Company’s non-current liabilities THB 20.4 MB and THB 11.4 MB respectively, equivalent to 4.7% and 2.6% respective of the total liabilities. The main non-current liabilities in long
enhance a company’s ability to generate long-term financial returns. Businesses that fail to make sufficient investments in the future can doom themselves to irrelevance. These businesses need us—their
Energy Earth Public Company Limited (EARTH) the extended deadline for clarifying the information regarding the existence and the fair value of the mining property rights over two mines located in Indonesia
Building Confidence in the Capital Market No. 10/2017 SEC grants a second extension to KC special audit report submission Bangkok, 13 March 2017 – The SEC has extended the deadline for submitting the
Building Confidence in the Capital Market No. 6/2017 SEC extends deadline for KC special audit report Bangkok, 10 February 2017 – The SEC has extended the deadline for submitting the special audit
Building Confidence in the Capital Market No. 10/2017 SEC grants a second extension to KC special audit report submission Bangkok, 13 March 2017 – The SEC has extended the deadline for submitting the
and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
affected by the floods. The Company continuously attempts to accelerate the installation afterward, however, the project still remains incomplete until now which is beyond the extended due date already