/ Rotation: Do they require that: · the length of time held by key audit partners and staff is monitored for; and are subject to rotation requirements 5 Contingent Fee Arrangements: Do they ensure that
• Transmission and distribution infrastructure dedicated to a direct connection or an expansion of connection between power plants with energy intensities less than 100 g CO2e/kWh (life cycle emissions) is