, transaction confirmation slip, receipt and clients’ asset statement. In case of cancelling any such form, a cancellation stamp on the form should be clearly visible; (4) prohibiting staff, clients or any
, transaction confirmation slip, receipt and clients’ asset statement. In case of cancelling any such form, a cancellation stamp on the form should be clearly visible; (4) prohibiting staff, clients or any
main office sufficient for not suffering from the same impacts and it should be able to support a large amount of critical business functions or a long-lasting emergengy incidents. In addition, the
boost up the remaining residences of MahaNakhon project for sale which are expected to transfer by Q1 2018. Nimit Langsuan Project: Currently, the tower core slip form casting has already passed level 5
MahaNakhon project for sale which are expected to transfer by Q1 2018. Nimit Langsuan Project: Currently, the tower core slip form casting has already passed level 5. Level 2 of the floor slab is fully
. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 11, the floor slab of level 9 is fully completed, and continually to
including exterior and interior decoration. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 11, the floor slab of level 9 is
megawatts of electricity and 170 to 300 ton per hour of steam. The project has 2 PPAs with EGAT (Firm type) at 90 megawatts each, lasting 25 years and, PPA with IRPC Group for 60 megawatts of electricity and
type) at 90 megawatts each, lasting 25 years and, PPA with IRPC Group for 60 megawatts of electricity and 170 to 300 ton per hour of steam, lasting 27 years. • GPSC holds 51% of total shares. • Total
process of tower core slip form casting reaching level 12, the floor slab of level 9 is fully completed, and continually to level 10 respectively. Project Operated By Project Value (MB) Total Units Sales