documented. 7 Does the firm specify conditions that require evaluation of a specific client or engagement, obtaining relevant information to determine whether the relationship should be continued, and
• Transmission and distribution infrastructure dedicated to a direct connection or an expansion of connection between power plants with energy intensities less than 100 g CO2e/kWh (life cycle emissions) is