- EPC Service 41.23 243.83 (202.60) (83.09) - Structure Mechanic and Pinging (SMP Service) 152.55 53.34 99.21 185.94 - Civil & Building Services 100.78 74.84 25.94 34.65 - Fabrication and Other services
Service 563.97 550.23 13.74 2.50 - Structure Mechanic and Pinging (SMP Service) 343.49 359.85 (16.36) (4.55) - Civil & Building Services 341.86 86.67 255.19 294.45 - Fabrication and Other services 137.77
Structural Mechanical Piping Electrical & Instrument service (SMP E&I) and Civil construction service. As at 31 March 2019, the Group has backlog for construction service in oil and gas sector totaling of
Fabrication and Other Services. As at 30 June 2019, the Group has backlog for construction service in oil and gas sector totaling of 1,814.43 Million Baht. On 18 July 2019, the Company also notify the project
million baht or 30.55%. The increase from the revenue from services by the Company, as a result of continue increasing demand of Non-Destructive testing service from construction and fabrication sector. And
from construction and fabrication sector. - Cost of service and administrative expense were 100.60 million Baht increased from the same period last year by 10.91 million Baht or 12.16%, as a result of
from construction and fabrication sector. And the Company also had revenue from inspection service for turnaround of refinery and petrochemical customer. - Cost of service and administrative expense were
Services) 162.77 79.06 83.71 105.89 315.33 132.40 182.93 138.16 - Civil & Building Services 114.94 84.08 30.86 36.72 215.72 158.92 56.80 35.74 - Fabrication and Other services 92.94 5.88 87.06 1,480.78
Services) 228.47 162.77 65.70 40.36 519.87 315.33 204.54 64.87 - Civil & Building Service 212.36 114.95 97.41 84.74 414.43 215.72 198.71 92.11 - Fabrication and Other service 116.03 92.93 23.10 24.86 209.25
, compared with the same period of 2018, with a net loss of 30.84 million baht, representing an increase of 52.76 million baht or 171.08 percent, consisting of net profit of palm oil trading business 20.43