Type of securities : Common share | Effective Date : 21/10/2005 | Close Selling Date : 27/10/2005
ประเภทหลักทรัพย์ : หุ้นสามัญ | วันที่มีผลใช้บังคับ : 21/10/2548 | วันที่ปิดการขาย : 27/10/2548
gas-fired combined cycle cogeneration power that commenced COD on February 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The Project was able
) has proceeded the hearing on the Notification of SPP Replacement for SPP combined cycle cogeneration plant that PPA will be expired during 2019-2025. Tentative timeline is EGAT will notify ERC on the
before Interest, Taxes, Depreciation and Amortization EDL = Electricite Du Laos EGAT = Electricity Generating Authority of Thailand ERC = Energy Regulatory Commission EPC = Engineering, Procurement and
the Small Power Producer (SPP) scheme, and reliable cash flows from long-term power purchase agreements (PPAs) with the Electricity Generating Authority of Thailand (EGAT) and reputable clients. (Please
combined cycle cogeneration power that commenced COD on June 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as
operation (SCOD) for 16 MW wind farm projects, 13 MW LK Solar Floating and 45 MW EGAT solar floating (EPC service) are extended by 3-6 months to Q1’2021. For communities, under the “B.Grimm Fights COVID-19
) successfully started commercial operation in October 2018. Therefore, total installed capacity of 3 SPP power plants which started commercial operation in 2018 is 399 MW which sell electricity to EGAT at 270 MW
cycle cogeneration power that commenced COD on October 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as