Offeror : (1) Hitachi Chemical Company, Ltd. (2) Siam Magi Company Limited | Date of submission of the Statement of Intention : 31/07/2017
Offeror : (1) Hitachi Chemical Company, Ltd. (2) Siam Magi Company Limited | Date of submission of the Statement of Intention : 08/08/2017
Offeror : Sustainable Battery Solutions, Inc. | Date of submission of the Statement of Intention : 14/12/2021
Offeror : Sustainable Battery Solutions, Inc. | Date of submission of the Statement of Intention : 04/01/2022
Offeror : Sustainable Battery Solutions, Inc. | Date of submission of the Statement of Intention : 12/01/2022
Offeror : Sustainable Battery Solutions, Inc. | Date of submission of the Statement of Intention : 17/01/2022
Will your project meet the Grids and Storage Criteria? It’s as easy as 1 2 3 6. Electricity storage facilities, and: 7. Dedicated supporting infrastructure to all the above. For grid infrastructure, this
power density greater than 5W/m2. For facilities becoming operational during 2020 or after, these thresholds are 50g CO2e/ kWh and 10W/m2. Additional criteria apply if it is a pumped storage facility. 3
purposes of water collection, storage, treatment or distribution, or for flood protection or drought resilience. Water Infrastructure Criteria under the Climate Bonds Standard – Criteria Document Climate
August 2022 Bioenergy Criteria under the Climate Bonds Standard Aug 2022 Revision Date Summary of changes 1.3 1 August 2022 Clarification that Bioenergy ‘Storage’ is within scope as supporting