Leisure 1,962.10 2 14 Industrial Materials and Machinery 15 Printing and Publishing 16 Property Development 16,153.90 10 17 Paper and Printing Materials 18 Fashion 19 Transportation and Logistics 5,400.00 3
Materials and Machinery 15 Printing and Publishing 16 Property Development 27,945.00 14 17 Paper and Printing Materials 18 Fashion 19 Transportation and Logistics 18,000.00 1 20 Automotive 200.00 1 21
. Personnel development C Personnel development: Firm's Reference /Guidance Notes Description 1 Does the firm have an induction course for new audit staff that communicates the firm’s policies and procedures
procedures properly covered in induction, professional training and Continuing Professional Development for all principals and staff? B12 Do these written policies and procedures cover the following general
of percentage for each source including the network firm, the TSQM manual published by TFAC, and internal development? 4 How does the firm design organizational structure for the risk assessment
development. ** Post-sunset dates, amber certification is no longer available ** Energy efficiency measures are covered under these energy sector criteria by the very means of establishing thresholds using
; • Engagements for entities in development stage; and • Requirement from the law or regulation on accepting or continuing a client engagement or withdrawing from engagement. If no, describe how the firm obtains
6,345,658 0.10522 CRD 26,891 0.00538 CREDIT 1,554,680 0.12647 CSC 200 0.00038 CSP 276,810 0.05579 CSR 1 0.00000 CSS 49,578,380 4.21678 CTARAF 727,301 0.22728 CTW 779,902 0.19600 CV 3,925,617 0.27913 CWT
0.81811 CRANE 21,622,714 2.85189 CRC 5,036,804 0.08352 CRD 26,896 0.00538 CREDIT 336,480 0.02737 CSC 200 0.00038 CSP 298,812 0.06022 CSR 1 0.00001 CSS 48,494,510 4.12460 CTARAF 727,301 0.22728 CTW 769,701
0.06462 CPT 315,395 0.03504 CPTGF 6,138,800 0.63483 CPW 4,798,938 0.79982 CRANE 21,093,710 2.78212 CRC 5,314,021 0.08811 CRD 26,911 0.00538 CREDIT 98,200 0.00798 CSC 200 0.00038 CSP 276,913 0.05581 CSR 1