Healthcare Center Co.,, Ltd. - a subsidiary of the Company and Wuttisak Clinic Inter Group Co., Ltd. – an indirect subsidiary of E FOR L Aim Public Co., Ltd. had been complete; and further progress shall be
) Gross profit 439.4 427.9 11.5 2.7 Net gain on exchange rate 55.1 112.2 (57.1) (50.9) Gain on forward contracts 11.2 49.5 (38.3) (77.4) Other income 2.0 173.0 (171.0) (98.8) Profit before expenses 507.7
and waiting for the permission to use the landfill. Secondly, a recycling plant in Lampoon is expected to be complete the construction in November 2018. Lastly, a waste water pre-treatment plant is now
) -6.7% Profit attributable to Owners of the Parent 424.2 716.2 -40.8% Foreign Exchange Gain (Loss) 94.6 250.6 -62.2% Adjustments of Revenue Levelization (TFRS 15)5 (64.6) 0.0 N/A Normalized Profit
885 15.8 1,208 (15.2) 3,185 3,354 (5.0) Gain on financial instruments measured at fair value through profit or loss 157 183 (14.4) - n.a. 799 - n.a. Gain on trading and foreign exchange transactions
progress reached 91%. The project is due to complete in 3Q19. • In February, the Company partnered-up with HKL (Thai Developments) Limited, a subsidiary of a global developer Hongkong Land Holdings Limited
% 565.9 78.2% 4.8 0.9% Cost of Sales 12.9 1.7% 157.5 4.3% 144.6 1121.1% Gross Profit 152.4 20.4% 156.16 12.6% 3.8 2.5% Gain from fair value adjustment on investment property 6.4 0.9% -3.5 -0.5% -9.9 -154.7
landfill is complete. However, the landfill cannot be used until authorities have checked the landfill and issue the permit. The permit is expected to be issued by Q3/2018. A new recycling plant (for non
% YoY with a YoY drop in net earnings of 213%, reflecting non-operating items incurred in 3Q16 and 3Q17 performance. For comparative purpose, without non-operating items, such as gain (loss) on exchange
. The revenue dropped because Jira-Khon Kaen Double-Track Railway Project and Xayaburi Hydropower Project were complete in 2019 and several projects are wrapping up, namely the Project Management, Supply