which started in November 2019 amounted of Baht (14.3) million. SDWTP started commercial services at the beginning of 2019 with installed capacity of 150,000 cubic meters per day (Phase 1A) and additional
treatment plant is scheduled to achieve COD in 3Q2020 with capactity of 9,600 cubic meter per day. Power In 4Q2019, Solar Rooftop had signed new 4.0 MW, total accumulated capacity in pipe line are 24.4 MW
structure and sufficient debt capacity. 7. The basis used to determine the value of consideration 7.1 The final bid value of spectrum license is based on the auction identified under the Notification of the
enhance the capability to develop new products to catch up with the technology changing and the dynamic marketing. Operating profit in Q1-19 totaling Baht 979 million or Baht 71 million down from the same
sale revenue increase by 4.43% results in better profit margin compare to the year 2018 which is increase by 10.87 million baht due to the company has more capability to control waste thus, the
by 4.40% QoQ as a result of ongoing repair and maintenance of the overall power generator which gradually improve power supply capacity and escalate power to grid. • Revenue from sale of industrial
) Profit sharing Attributed to the shareholders of the Company 27.54 4.66% 30.76 6.32% (3.22) (10.48) Attributed to the stakeholders with non- controlling capability in subsidiary companies -6.41 -1.08% 6.26
significantly higher than last year quarter due to the Company entered the Tolling agreement with G Steel for producing of HRC to increase the normal capacity during off peak power usage commencing in 4th Quarter
Rayong were 43% and 52% of total capacity respectively. Water Volume (Million Cu.M) Chonburi Rayong Bangpra Nongkho Bangpra Nongkho Bangpra Nongkho Water reserve 52.97 5.98 32.08 97.96 29.46 138.92
continued to grow well by c.20%. Net profit in Q2/2017 was Baht 61 million, a decrease of 57% YoY due to 1) higher cost per unit resulted from lower capacity utilization; 2) higher depreciation resulted