the Covid-19 outbreaks. However, most of the drop was compensated by sales of Woody C+ Lock Lemon Flavoured, the new vitamin C drink launched in March 2020 under the Company’s production and the joint
2025 2026 Construction period Land reclamation Land reclamation 2027 Construction preparation 2nd runway & taxiway preparation Begin operation of new Runway/ Terminal 2 & phase 1 of Airport City Begin
the game transparent as well as serving as the core of a mechanism that can be applied by all market players. In order to begin assessing the application process, it is very important to sort out the
precipitate and sulfur in various forms, and move manufacturing Zirconium Silicate combined manufacturing operations at its plant in Prachinburi. Only The company will begin production at its plant in
composition and it is expected to begin delivery in Q2/2018. The construction of a new non-hazardous waste is completed and it is in the process of inspection and it is expected to start receiving waste in Q2
launch these products to other customer both domestically and internationally. Moreover, we will begin to launch other new products hoping to have them evaluated and to get with the customers some results
of the asset or project, with no further disclosure or documentation required. • An orange circle indicates where eligibility is conditional on meeting specific requirements. These requirements are
both marketing and investment plan, a construction of the new pre-treatment factory is expected to begin early 2018 and the construction is expected to be complete in 6 months. Real estate business in Q3
Employer: JAS Asset Public Company Limited Contractor: Is in the process of recruiting (construction is expected to begin in the second quarter of 2019) The relationship between Employer and Contractor
notifying list of incorrect or incomplete documents and a period of time for the applicant to fix or fill up additional information. ** The SEC Office will not consider the application or begin the processing